A work breakdown structure with at least 3 levels A project schedule with at least 3 phases and at least 9 tasks At least 2 milestones People and

A work breakdown structure with at least 3 levels
A project schedule with at least 3 phases and at least 9 tasks
At least 2 milestones
People and other resources assigned to each of the tasks
Project’s overall budget
Adjusted project tasks, schedules, and costs based on potential project risks
The format should be a Project file, PDF, or other format noted by the instructor.
The project deliverable includes the construction of a 50’x50′ storage building shell. The building will have a foundation, four walls, and a roof. Electricity will be added to the building to include overhead lights and 5 outlets on each wall, for a total of 25 outlets. A 20-foot-long rollup door will be on the building. Each of the 3 other walls will have a regular door and a set of windows.

Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more