Decision Tree Question – Do in Excel Analytic Solver In the early 1980s, New England Electric System (NEES) was deciding how much to bid for the salvage rights to a grounded ship, the SS Kuniang. If t

Decision Tree Question – Do in Excel Analytic Solver

In the early 1980s, New England Electric System (NEES) was deciding how much to bid for the salvage rights to a grounded ship, the SS Kuniang. If the bid were successful, the ship could be repaired and outfitted to haul coal for the company’s power-generation stations. But the value of doing so depended on the outcome of a U.S. Coast Guard judgment about the salvage value of the ship. The Coast Guard’s judgment involved an obscure law regarding domestic shipping in coastal waters. If the judgment were to indicate a low salvage value (an outcome with an estimated 30 percent chance of occurring), and if NEES submitted the winning bid, then NEES would be able to use the ship for its shipping needs without additional costs. If the judgment were high, the cost to NEES would run $4 million higher than if the judgment were low. The Coast Guard’s judgment would not be known until after the winning bid was chosen, so there was considerable risk associated with submitting a bid. If the bid were to fail, NEES could purchase either a new ship or a tug/ barge combination, both of which were relatively expensive alternatives. Analysts at NEES estimated that purchasing a new ship for these purposes would lead to profits of $3.2 million (calculated as a net present value over 20 years of shipping). Purchasing a tug/barge combination would lead to profits of only $1.6 million. By comparison, if NEES could acquire the Kuniang at the low salvage value, it could achieve profits of $15.5 million, exclusive of its bid. One of the major issues was that the higher the bid, the more likely NEES would be to win. NEES judged that a bid of $2 million would definitely not win, whereas a bid of $12 million definitely would win. As a first cut, we can represent three bids:• A bid of $2 million would certainly not win.• A bid of $8 million would have a 60 percent chance of winning.• A bid of $12 million would certainly win.The goal for NEES was to maximize its profits from supplying coal to its plants.1a. What is the best of the three bids for NEES? What is the optimal expected profit?b. Consider the estimate of $4 million difference between the cost with a low salvage value and the cost with a high salvage value. For what range of values in this figure does the optimal bid in part (a) remain unchanged?c. Enrich the bidding sub model as follows. For a bid of x (in millions of dollars), the probability of winning is W(x), where W(x) is a linear function between x = 2 and x = 12. What is the best value of x?

Show more

Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more