The writer is very fast, professional and responded to the review request fast also. Thank you.
Analyst Case Study
Transportation
You are the Analyst for a small bulk transportation operation located in Houston, TX. Your manager has informed you that ABC Refinery recently sent out a Request for Proposal (RFP) to provide PetCoke transportation services. The volumes are expected to be 1,000,000 tons each year. The product will be transported on a ratable basis during the twelve months of the year; hence, transportation services will need to be provided 24/7, 365 days per year.
Your manager has asked you to calculate the transportation rate necessary to achieve an 88% Operating Ratio (Total Expenses / Total Revenue). You have performed a zero-based analysis of the costs for providing these services and have summarized your findings as follows:
The current truck yard and maintenance shop is sufficient for the additional equipment
The current lease payment for the land is $10,000 per month
The shop has annual depreciation of $36,000 per year
One-way miles: 15.1
Anticipated MPH: 48
Time to Load & Unload: 30 minutes
Time for Pre/Post Shift Check and Fueling: 45 minutes
Cost of diesel: $4.05/gal
MPG: 5.2
Tons of PetCoke per Load: 25.50
Tire Expense: $.08 per mile
Parts & Supplies Expense: $0.16 per mile
Outside Maintenance Expense: $0.04 per mile
Driver Pay:
The current market analysis shows the drivers annual wages need to be roughly $55,000 per year. The drivers need to be paid on a “per load” basis; hence you need to calculate what the pay per load needs to be and reflect this pay structure in your pro forma.
Drivers schedule will be 11 hours per day 5 days per week
Bonus Pay: 4% of Labor
One mechanic for every six tractors (assume 50 hour work weeks)
Mechanic Pay: $24.00 per hour
Cost of tractor: $105,000
Depreciate over 3 years
Salvage Value: 15% of purchase price
Insurance cost: $260 per month per tractor
Cost of trailer: $150,000
Depreciate over 10 years
Salvage Value: Zero
Insurance costs: .85% of the total purchase price
Savage’s CFO has indicated the interest rate will be 5.50% for all capital purchases
Overhead support as follows:
Operation Manager: $85,000 (salary)
Maintenance Manager: $70,000 (salary)
Coordinator: $20 per hour (40 hour work week)
Fringe benefit costs will be 38% of wages and salaries (also applies to drivers and maintenance employees)
Travel and other manager expenses will cost $500 a month except in June when the costs will be $3,000
General Liability Insurance costs will be 1.5% of revenue
Telephone and other utilities will be $35,000 per year
Office and facility supplies, uniforms, and miscellaneous expenses will be $2,500 per month
General overhead costs will be 10% of revenue
Ignore taxes
Prepare a pro forma for this opportunity as requested by your manager, and calculate the rate per ton needed to generate an 88% operating ratio.
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more