Questions:
1.
Vasal contacts Navid if he would be interested in purchasing his car for US15000$. Navid immediately takes US15000 to Vasal and says he wants to buy the car. Vasal subsequently does not wishto proceed.
a) What is the consequence of the above scenario?
b) Give full detail and feedback on your answer for part (a)
c)You have been appointed as a procurement officer at CQU. Your task is to prepare the tender documents for the project of refurbishing the CQU library at SYD campus.
What are the steps you are taking to finalise the bidding process including awarding the contract? Your answer should be inclusive and in chronological order.
d)A contractor entered into a contract with a CQU to supply furniture. CQU later decided to change the scope and add some more items. Extra items will be needed, and this entitle an increase of the BOQ by 8%.
Can this work be done through a change order to the original contract? OR
Should it be advertised for bids under a separate contract?
2.
As a project manager working for the contracting construction company your client has asked you to change and delete some parts and items of the external works. The client finds these items in the BOQ are no longer needed. The removal of these items will significantly affect the scope of the work, the project budget and time.
a) Will you accept this change request and Why?
b)What are the steps that you will be taking to respond to this change request and to ensure the right for a valid claim? List these steps in chronological order
c)Log in your Moodle now (Lecture slides for Variation Orders, claims and dispute resolution). Re-produce the graph by Hui et al., 2009 that can support your above answer in section b. Only provide and update the relevant parts to your answer for section (b) You need to plot the graph in your answer sheet
d)Covid 19 and the unprecedented conditions have altered the demands of many products. The supply matrixfor many products has been changed accordingly where some products were relocated, for example, from non-critical Items to strategic items as in the Profit Impact-Supply Risk matrixshown in Week 10.
Log into your Moodle now -Chapter 10- and use the graph of the supply matrix to express Threeproducts that have been relocated in this matrix due to Covid19.
You need to:
-Name these products,
-Show where they normally are
-Show their new position in the matrix due to the Covid19 and why do you think so?
3.
You have been working as a PM at an IT company for a project at NSW. The project includes supplying and installing various IT materials and infrastructure at various sites in NSW owned by the Federal government.
The unprecedented conditions due to Covid 19 resulted in the federal government imposing new measure including social distancing and your projects suffers huge delay and challenges. This has resulted in a significant delay in materials supply, and labours delivery.
As a project manager, you are about to prepare a claim to the client asking for compensation
a)What will you be asking for? List the main 5 items you will include in your claim
b)What Burden of proof will suite your case most? Explain your answer in detail and how will you deal with this issue to prove your claim and what evidences you will be willing to get
c)Assuming your client did not accept your claim, explain what measures/methods steps you are taking to resolve this dispute in chronological order.
4.
As a construction Manager (CM) appointed by the CQU to advice on the new project they are doing in Rockhampton Campus. The project components are as follow:
Conference Hall fully equipped with all up to date infrastructure including Furniture, sound system, 1500 Seats (best quality). Lighting system has to include materials and technology that has not been used in the region before.
This makes the design complexand subject to changes!
The materials to be used has to sustain for at least 15 years and the university has to maintain this over the time
CQU got enough experience BUT with limited resources.
The university has to get this Hall ready for use before the next graduation ceremony in November 2019. Urgent and tight schedule.
Time is the most priority for the university.
However, they are very much looking for the quality
CQuniversity has good amount for contingency so the cost is coming third after Time and Quality
Priority is 1)TIME, 2) QUALITY and then 3) Cost.
Your task is to advise the university on the way forward by doing the following:
(a)Select the BEST procurement Route the CQuniveristy has to follow.
(b) Explain the advantages of this route from the Owner point view.
(c)Highlight the RISKS associated with the selected route and explain how the CQuniversity limit these risks.
5.
a)You are working as a development manager in a supply chain management firm and your firm does not have enough software developers to design and develop the new IT System. You need to convince your IT director to outsource this project. Explain at four benefits of the Outsourcing and the potential four risks you may face.
b)Engineering firms A, B, and C are separately invited by a client to appear at an interview to discuss various aspects of an engineering design project which the client has under consideration. Each invitation makes it clear that the interview will be of a preliminary nature, following which the firm may be selected for the project. At the separate interviews, unknown to each other, each firm is asked to submit in writing a detailed proposal of the scope of the services to be furnished, including a statement of the estimated charges for engineering services, expressed in terms of money, man hours or other work units. Prior to submitting such a proposal, each firm learns that the others have also been asked to furnish similar information. Engineering firm A decides to continue pursuing of the business opportunity with the client, but firms B and C decide to bow out.
1)Would it be proper for Engineering firms A, B, and C, acting independently, to provide the client with a statement of the estimated charges for engineering services expressed in terms of money, man hours or other work unit information?
2) After learning that the client was making price comparisons prior to selection of a firm, was it ethical for Engineering Firm A to participate further?
Read less
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more