Direct labor budget | Accounting homework help

 

Sedona Company set the following standard costs for one unit of its product for 2013.

 

  

  Direct material (15 Ibs. @ $3.80 per Ib.)$57.00 

  Direct labor (10 hrs. @ $9.40 per hr.)94.00 

  Factory variable overhead (10 hrs. @ $4.20 per hr.)42.00 

  Factory fixed overhead (10 hrs. @ $2.50 per hr.)25.00 

 

  Standard cost$218.00 

 

 

The $6.70 ($4.20 + $2.50) total overhead rate per direct labor hour is based on an expected operating level equal to 60% of the factory’s capacity of 64,000 units per month. The following monthly flexible budget information is also available.

 

 Operating Levels (% of capacity) 

 55%60%65% 

  Budgeted output (units)35,20038,40041,600 

  Budgeted labor (standard hours)352,000384,000416,000 

  Budgeted overhead (dollars) 

     Variable overhead$1,478,400$1,612,800$1,747,200 

     Fixed overhead960,000960,000960,000 

  

     Total overhead$2,438,400$2,572,800$2,707,200

 

During the current month, the company operated at 55% of capacity, employees worked 334,000 hours, and the following actual overhead costs were incurred.

 

  

  Variable overhead costs$1,421,000 

  Fixed overhead costs1,024,000  

  Total overhead costs$2,445,000

 

 11.

value:

10.00 points

1.Compute the variable overhead spending and efficiency variances. (Round “AVR” and “SVR” to 2 decimal places.)

 12.

value:

10.00 points

 

2.Compute the fixed overhead spending and volume variances. (Round “AFR” and “SFR” to 2 decimal places.)

 13.

value:

10.00 points

3.Compute the controllable variance.  

Hart Company made 3,400 bookshelves using 23,000 board feet of wood costing $287,500. The company’s direct materials standards for one bookshelf are 8 board feet of wood at $12.40 per board foot.

(1)Compute the direct materials variances incurred in manufacturing these bookshelves. (Round “AP” and “SP” to 2 decimal places.)

Hart Company made 3,400 bookshelves using 23,000 board feet of wood costing $287,500. The company’s direct materials standards for one bookshelf are 8 board feet of wood at $12.40 per board foot.

(1)Compute the direct materials variances incurred in manufacturing these bookshelves. (Round “AP” and “SP” to 2 decimal places.)

Electro Company manufactures an innovative automobile transmission for electric cars. Management predicts that ending inventory for the first quarter will be 38,300 units. The following unit sales of the transmissions are expected during the rest of the year: second quarter, 220,000 units; third quarter, 499,000 units; and fourth quarter, 246,000 units. Company policy calls for the ending inventory of a quarter to equal 32% of the next quarter’s budgeted sales. Each transmission requires 4.00 direct labor hours, at a cost of $17.80 per hour.

  

Prepare a direct labor budget for the second quarter

 

Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more