Assessment item 3CharterValue: 30%Due date: 21-May-2018Return date: 13-Jun-2018Submission method optionsAlternative submission method
Task
You are to prepare and submit Assessment 3 as an individual, based on the Virtucon/Globex scenario, and your peer to peer learning from Assessment 2.
You are required to develop a charter for the Project including:
Part One:
MOV – Measurable Organisational Value
(This is the goal of the project and is utilised to define the value that your team project will bring to your client)
• Identify the desired area of impact – Rank the following areas in terms of importance: Strategy / Customer / Financial / Operational / Social
• With reference to your project, identify one or two of the following types of value:
• Develop an appropriate metric – this sets the target and expectation of all the stakeholders. It is important to determine a quantitative target that needs to be expressed as a metric in terms of an increase or decrease of money.
• Determine the timeframe for achieving the MOV – ask yourselves, when do we want to achieve this target metric?
• SUMMARISE THE MOV IN A CLEAR CONCISE STATEMENT OR TABLE
(Note: the MOV should inform everyone what the project will achieve, not how it will be achieved. It should also focus on the organisation, not on the technology that will be used to build or support the information system).
Part Two:
Define Scope and produce a Scope Management Plan
Define the scope of the project and detail how the scope will be managed.
Provide a list of Resources
Identify and detail the resources for the project using MS Project where appropriate, including:
Part Three:
Using Project Libre (or MS Project), develop a schedule using a high level Work Breakdown Structure (WBS). It should include:
A summary of the WBS should be clearly provided in the report. The Project Libre file must also be submitted for marking.
Part Four:
Project Risk Analysis and Plan
Part Five:
Quality Management Plan. It should include:
Part Six:
Closure and Evaluation
Rationale
This assessment addresses the following learning outcomes:
Marking criteria
CriterionHigh DistinctionDistinctionCreditPassFailProvides an MOV and identifies the target and expectations of all stakeholders in a suitable format.
(15 Marks)The MOV illustrates the student’s detailed consideration of the target and a thorough analysis of the expectations of all stakeholders.The format is logical, clear and well-structured.The MOV illustrates the student’s detailed consideration of the target and an attempt at analysis of the expectations of all stakeholders is evident.The format is logical and appropriate to the information presented.The MOV illustrates the student’s generalised consideration of the target and an attempt at analysis of the expectations of most stakeholders is evident.The format is suitable to the information presented.The MOV illustrates the student’s generalised consideration of the target; however analysis of the expectations of all stakeholders is not clear.The format is suitable to the information presented.The MOV fails to cover any of the specified project requirements.Provides a list of resources associated with the project – including reference to people, technology, and facilities and associated costs
(10 Marks)A comprehensive list of resources, demonstrating in-depth analysis of the project’s needs.A list of all resources required for the project; demonstrating analysis of the project’s needs. A list which identifies most of the resources required for the project; some evidence of analysis of project needs.Some key resources are correctly identified and documented. Key resources have not been identified. Produces a Scope Management Plan (SCM).
(10 Marks)Consistent application of industry standard language and formatting.Well written with some demonstration of industry standard language and formatting.Well written with demonstration of academic standard language and formatting. Well written but lacks acceptable formatting.Writing is not of an acceptable standard.Utilising MS Project -evidences the processes involved with a WBS, including budget.
(15 Marks)Demonstrates high level project management skills, integrating and applying project management tools in meaningful and purposeful ways towards completion of WBS design, correctly and comprehensively addressing all project requirements.Demonstrates competent management skills, applying project management tools in meaningful and purposeful ways towards completion of the WBS design, correctly addresses the all project requirements. Demonstrates essential management skills, applying project management tools in meaningful and purposeful ways towards completion of the WBS design. Essential project requirements addressed. Demonstrates minimal management skills and needs some improvement in applying project management tools in meaningful and purposeful ways towards completion of WBS. Not all project requirements are clearly addressed. The WBS design fails to correctly address one or more essential project requirements. Provides a project risk analysis and plan using the risk identification framework as a basis for discussing alternate strategies for the management of such risks.
(15 Marks)All steps in project risk analysis and alternate strategies are comprehensively discussed and presented in the context of the project, with evidence of thorough consideration of the framework to validate the alternatives.All steps in project risk analysis and alternate strategies are clearly discussed and presented in the context of the project, with reference to the framework to validate the alternatives.Evidence that key steps in project risk analysis and alternate strategies are discussed and presented in the context of the project, with some linkages back to the framework to validate the alternatives. Key steps in project risk analysis and alternate strategies are accurately presented. Minimal reference to framework in the discussion presented. One or more key steps in project risk analysis and alternate strategies are not presented. Produces a quality management plan which includes a statement about the team’s philosophy and verification and validation activities.
(15 Marks)All required project steps are correctly identified and appropriately contextualised for the selected project. All required project steps are correctly identified and are applied to the selected project with some contextualisation. All required project steps are correctly identified and are applied to the selected project. Most required project steps are correctly identified and applied to the selected project. Multiple project steps are missing or not applied to the selected project. A closure checklist is produced alongside the development of a project evaluation.
(10 marks)The closure checklist is detailed, and has been used accurately to close the project. The evaluation has been professionally documented.The closure checklist is detailed, and has been used accurately to close the project. The evaluation has been well documented.The closure checklist has been used appropriately to close the project, and the evaluation has been adequately documented.The closure checklist has been used to close the project, and the evaluation has been addressed.
The closure checklist has not been addressed adequately, and the evaluation is lacking detail.Referencing of sources (APA 6th ed citation) to reinforce findings.
(10 marks)All written evidence is professionally communicated using correct referencing.All written evidence is good with appropriate referencing Generally well organised but more support is required in terms of referencing.Content is loosely connected, and referencing is not always effective. Content is poorly organised and there is a lack of referencing.
Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.
You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.
Read moreEach paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.
Read moreThanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.
Read moreYour email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.
Read moreBy sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.
Read more