Greenwood company – traditional and activity based overhead allocation

Greenwood Company manufactures two products—15,000 units of Product Y and 7,000 units of Product Z.

The company uses a plantwide overhead rate based on direct labor-hours. It is considering implementing an activity-based costing (ABC) system that allocates all of its manufacturing overhead to four cost pools.

The following additional information is available for the company as a whole and for Products Y and Z:

 Activity Cost Pool                 Activity Measure        Estimated Overhead Cost Expected Activity Machining                                     Machine-hours            $ 216,700                    11,000 MHs

Machine setups                       Number of setups        $ 79,900                      170 setups

Production design                   Number of products    $ 81,000                      2 products

General factory                       Direct labor-hours       $ 247,000                    10,000 DLHs

Activity Measure                    Product Y                   Product Z

Machining                               6,700                           4,300

Number of setups                    60                                110

Number of products                1                                  1

Direct labor-hours                   7,700                           2,300

1. What is the company’s plantwide overhead rate? (Round your answer to 2 decimal places.) (Per DHL)

2. Using the plantwide overhead rate, how much manufacturing overhead cost is allocated to Product Y and Product Z? (Round your intermediate calculations to 2 decimal places and final answers to the nearest dollar amount.) (Manufacturing Overhead allocated for Product Y and Product Z)

3. What is the activity rate for the Machining activity cost pool? (Round your answer to 2 decimal places.) (Activity Rate per MH)

4. What is the activity rate for the Machine Setups activity cost pool? (Round your answer to 2 decimal places.) (Activity Rate per set up)

5. What is the activity rate for the Product Design activity cost pool? (Round your answer to 2 decimal places.) (Activity Rate per product)

6. What is the activity rate for the General Factory activity cost pool? (Round your answer to 2 decimal places.) (Activity Rate per DLH) 7.

7. Which of the four activities is a batch-level activity? A. Machining activity B. General factory activity C. Product design activity D. Machine setups activity

8. 8. Which of the four activities is a product-level activity? A. Machining activity B. General factory activity C. Product design activity D. Machine setups activity

9. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Y? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)(Total Manufacturing Overhead Cost)

10. Using the ABC system, how much total manufacturing overhead cost would be assigned to Product Z? (Round your intermediate calculations to 2 decimal places and final answer to the nearest dollar amount.)( Total Manufacturing Overhead Cost)

11. Using the plantwide overhead rate, what percentage of the total overhead cost is allocated to Product Y and Product Z? (Round your answers to 2 decimal places.) (Total Overhead Cost Product Y% Product Z%)

12. Using the ABC system, what percentage of the Machining costs is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.) (Machining Cost Product Y% Product Z%)

13. Using the ABC system, what percentage of Machine Setups cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)( Machining Set Up Cost Product Y% Product Z%)

14. Using the ABC system, what percentage of the Product Design cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)(Product Design Cost Product Y% Product Z%)

 

15. Using the ABC system, what percentage of the General Factory cost is assigned to Product Y and Product Z? (Round your answers to 2 decimal places.)(General Factory Cost Product Y% Product Z%)

Calculate Your Essay Price
(550 words)

Approximate price: $22

Calculate the price of your order

550 words
We'll send you the first draft for approval by September 11, 2018 at 10:52 AM
Total price:
$26
The price is based on these factors:
Academic level
Number of pages
Urgency
Basic features
  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support
On-demand options
  • Writer’s samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading
Paper format
  • 275 words per page
  • 12 pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, Chicago/Turabian, Harvard)

Our guarantees

Delivering a high-quality product at a reasonable price is not enough anymore.
That’s why we have developed 5 beneficial guarantees that will make your experience with our service enjoyable, easy, and safe.

Money-back guarantee

You have to be 100% sure of the quality of your product to give a money-back guarantee. This describes us perfectly. Make sure that this guarantee is totally transparent.

Read more

Zero-plagiarism guarantee

Each paper is composed from scratch, according to your instructions. It is then checked by our plagiarism-detection software. There is no gap where plagiarism could squeeze in.

Read more

Free-revision policy

Thanks to our free revisions, there is no way for you to be unsatisfied. We will work on your paper until you are completely happy with the result.

Read more

Privacy policy

Your email is safe, as we store it according to international data protection rules. Your bank details are secure, as we use only reliable payment systems.

Read more

Fair-cooperation guarantee

By sending us your money, you buy the service we provide. Check out our terms and conditions if you prefer business talks to be laid out in official language.

Read more